Yes! The wiring work has completed today. Jo called me asking the remaining payment for his work. I told him that i would be at Hj Naza's house at about 10.30 pm. I arrived at Hj Naza's house and inspected the work. Alhamdulillah, the work is satisfactory. Jo arrived a bit later and we had had a chit chat about his work. I paid the remaining balance of RM500 and he was very happy!
Allrite! |
'JELAS'.. means fully paid |
Let see what he has fixed for this work;
DB plate for future dedicated meter |
2 plug points, 1fluorescent light and 1 switch at the main entrance + old fan |
1 plug point for refrigerator |
1 switch box for safety |
4 plug points for each row of the shelf (later will add timer) |
This is how it looks like |
A total of 16 fluorescent lights |
3 plug points and the one on top right is for air conditioner |
1 plug points and 1 fluorescent light |